The most common mistake is buying for the dream, not the market. A plant running at 40% loses money even if the machines are excellent.
Start from sales
- How many tons a month can your distributors realistically move in year one?
- Divide by 25 working days. That's your daily need.
- Choose a plant rated at about 1.3 to 1.5 times that, to cover peaks and downtime.
Capacity guide
| You can sell (per month) | Choose |
|---|---|
| Up to 25 tons | 1 ton/day |
| 50–100 tons | 3–5 tons/day |
| 150–250 tons | 10 tons/day |
Plan for growth without overbuying
- Buy the building and electrical supply for the next size up.
- Run a second shift before buying a second line.
- Packing is usually the first bottleneck, so upgrade the packer first.
Related guides
Buying guide
Turnkey Plant vs Buying Machines from China: Which Is Better?
The real cost of buying loose machines versus a turnkey plant with installation, formula and supply.
View Buying guideSpray-Dried vs Dry-Mix Detergent Powder
The difference between blown (spray-dried) and dry-mix detergent powder, and which plant to build.
View